Major reconstruction of Espanola roads will continue into late fall

By Rosalind Russell – The Town of Espanola is well into the road reconstruction season.

The town has two major capital projects this year.

One project is on Mead Boulevard.

A detour has been set up along the road and signage is in place for motorists

The second project is the main street running through Espanola called Highway Six-Centre Street.

The work includes the installation of new water and sewer pipes as well as new road construction.

The Highway Six work will also include sidewalks.

Motorists are asked to keep an eye out for signage and to slow down through the construction area, especially on Highway Six – Centre Street.

Photo: The Town of Espanola has two major road projects underway, one on Mead Blvd, the other on Centre Street – Highway Six. Photos by Rosalind Russell

This entry was posted in Local, News. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *